|
POLYSPEC® CONSTRUCTION SERVICES, INC. PROJECT PROFILE - TX DOT GALVESTON FERRIES - RAY STOKER JR.
Texas DOT – Galveston Ferries – Ray Stoker Jr., located in the Southwest Shipyards of Houston, TX, came to PolySpec Construction Services to complete
a multi-tiered project that included the following:
- Demolish 1,200 SF of existing epoxy flooring and A60 underlayment down to original steel deck
- Re-install 1,200 SF of new A60 insulation and new IMO approved epoxy flake system flooring
- Install 4 TX Dot custom decal iInlays
- Install 4" rubber base
Additional considerations included the use of products that conform to A60 Fire Resistant ratings, IMO and
Coast Guard Approved products. Surfaces need to be corrosion resistant, salt water resistant, waterproof,
non-slip, and abrasion resistant. Appearance of flooring needed to be decorative.
Marine Decking Products Used:
- American Safety MS-11CZ - Anti-Corrosive Steel Primer
- PolySpec® 7K - IMO Approved Deck Top Magnesium Insulation
- PolySpec® FLEX IMO - IMO Approved Flexible Decorative Chip Seamless Floor
- TuffRez® 236 with Aluminum Oxide - Polyurethane Coating
View
Texas DOT – Galveston Ferries – Ray Stoker Jr. Project Profile (.pdf)
>>>> back to Maritime Industry Project
Profiles page
>>>> back to main Project
Profiles page
|